Upload the permit set and select the jurisdiction. IIVY checks the drawings against the checklist, returns cited findings, and prepares the report for the next step.
The set goes in. IIVY returns cited findings. Your team knows what to fix before the counter does.
Let IIVY handle the cited first pass so examiners can focus on the decisions that need human judgment.
Let IIVY review the set before it reaches the counter, then resolve the cited issues while they are still inexpensive to fix.
Not a chat transcript. IIVY gives you a cited, structured record with the detail needed to fix or communicate each finding.
PlanMinds| # | Domain | Sheet | Code § | Finding | Status |
|---|---|---|---|---|---|
| 01 | Egress | A-201 | IBC 1017.2 | Common path of travel 118 ft exceeds 100 ft maximum for Occupancy B. | Objection |
| 02 | Accessibility | A-401 | IBC 1010.1.1 | Clear door width 30 in below 32 in minimum at unit entries. | Objection |
| 03 | Fire & Life Safety | A-301 | IBC 708.3 | 1-hour corridor separation not indicated at Level 2. | Objection |
| 04 | Envelope | A-501 | IECC C402.1.4 | Curtain-wall assembly U-factor not scheduled. | Objection |
| 05 | Occupancy & Area | A-101 | IBC Table 1004.5 | Occupant-load calculation verified. | Cleared |
| 06 | Zoning & Use | C-100 | §12.10 | FAR 2.4 within 2.5 permitted; setbacks conform. | Cleared |
| 07 | Structural | S-200 | IBC 1604.3 | Lateral system and deflection limits documented. | Cleared |
Bring a real set to a demo and see IIVY check the code, cite the findings, and prepare the report in one workflow.